We have a network that uses Symantec Backup Exec 10d for our backups. Recently to have another source of backups, we bought 5 1TB hard drives. Now our backup order is to these Sata Drives and then to the Tapes.
The problem with the drives is: if we don't format them every day, the next job will be about 3hrs longer.
I was wondering if anyone could help me create a scheduled task that would format our B:/ drive (our backup drive).
Thanks So Much
The problem with the drives is: if we don't format them every day, the next job will be about 3hrs longer.
I was wondering if anyone could help me create a scheduled task that would format our B:/ drive (our backup drive).
Thanks So Much