- Joined
- Dec 19, 2005
- Messages
- 17,660
Local references: “Intel CEO admits 'I've bet the whole company on 18A'
"I’ve bet the whole company on 18A." So, says IntelCEO Pat Gelsinger in the most deadpan, matter-of-fact manner imaginable. He's not glib. He's not joking. Everything rides on Intel's 18A process according to Gelsinger.”
—-
“The report also hints that Intel's in-house foundry nodes going off the rails could be an important event leading up to the company's Board letting go of former CEO Pat Gelsinger, as huge 2nd order effects will be felt across the company's entire product stack in development. For example, company roadmaps put the company's next-generation "Clearwater Forest" server processor, slated for 2025, as being designed for the Intel 18A node. Unless Intel Foundry can pull a miracle, an effort must be underway to redesign the chip for whichever TSMC node is considered cutting-edge in 2025.”
Source: https://www.techpowerup.com/329513/intel-18a-process-node-clocks-an-abysmal-10-yield-report
"I’ve bet the whole company on 18A." So, says IntelCEO Pat Gelsinger in the most deadpan, matter-of-fact manner imaginable. He's not glib. He's not joking. Everything rides on Intel's 18A process according to Gelsinger.”
—-
“The report also hints that Intel's in-house foundry nodes going off the rails could be an important event leading up to the company's Board letting go of former CEO Pat Gelsinger, as huge 2nd order effects will be felt across the company's entire product stack in development. For example, company roadmaps put the company's next-generation "Clearwater Forest" server processor, slated for 2025, as being designed for the Intel 18A node. Unless Intel Foundry can pull a miracle, an effort must be underway to redesign the chip for whichever TSMC node is considered cutting-edge in 2025.”
Source: https://www.techpowerup.com/329513/intel-18a-process-node-clocks-an-abysmal-10-yield-report